Luton Direct Air-Rail Transit (DART) / Arup

Luton Direct Air-Rail Transit (DART) / Arup - Exterior Photography, FacadeLuton Direct Air-Rail Transit (DART) / Arup - Interior PhotographyLuton Direct Air-Rail Transit (DART) / Arup - Interior PhotographyLuton Direct Air-Rail Transit (DART) / Arup - Interior PhotographyLuton Direct Air-Rail Transit (DART) / Arup - More Images+ 34

  • Architects: Arup
  • Area Area of this architecture project Area:  10616
  • Year Completion year of this architecture project Year:  2023
  • Photographs
    Photographs:Simon Kennedy
  • Manufacturers Brands with products used in this architecture project
    Manufacturers:  Pilkington, Sika, AkzoNobel, Barwest , British Gypsum, Carvatech , Delta Balustrades Ltd , F. P. McCann , Kingfisher lighting, Marshalls paving , NJ Doyne, Prater Ltd. , Promat, Quietstone, SAS , Severfield, Shadbolt, The BILCO Company, Victor Buyck Steel Construction , Vista, +1
  • Project Director: Alison Norrish
  • Architectural Director: Nille Juul-Sorensen
  • Nille Juul Sorensen: Vinicius Gaio de Siqueira
  • Project Architect Design Development: Belinda Parker
  • Project Architect Construction Phase: Sean Macintosh
  • Architect: Mat Walker
  • Project Architect Concept Stage:: Vinicius Gaio de Siqueira
  • City: Luton
  • Country: United Kingdom
More SpecsLess Specs
Luton Direct Air-Rail Transit (DART) / Arup - Exterior Photography
© Simon Kennedy

Text description provided by the architects. The Luton DART (Direct Air-Rail Transit) is a pioneering fully-automated people mover that transports travelers from Luton Airport Parkway railway station to the terminal of London Luton Airport in under four minutes. The project was designed and delivered by a holistic multi-disciplinary Arup team, including Architects, Engineers, Planners and Specialists. Arup’s Architecture team designed a common language of bold, sculptural parasol structures that support the roof and allow light and air to enter the stations, whilst protecting passengers from the weather. This created striking spaces that are open and generous in size, naturally lit and ventilated.

Luton Direct Air-Rail Transit (DART) / Arup - Exterior Photography, Facade
© Simon Kennedy
Luton Direct Air-Rail Transit (DART) / Arup - Exterior Photography
© Simon Kennedy
Luton Direct Air-Rail Transit (DART) / Arup - Image 28 of 39

Providing travelers with a speedier, greener, and more efficient journey, the Luton DART will help reduce the proportion of passenger and employee trips to the airport by car. The new airport transfer facilitates faster journeys from across the rail network. Passengers traveling from London St Pancras to the London Luton Airport terminal can now do so in as little as 32 minutes, making this one of the shortest airport connections to and from central London.

Luton Direct Air-Rail Transit (DART) / Arup - Interior Photography
© Simon Kennedy
Luton Direct Air-Rail Transit (DART) / Arup - Interior Photography
© Simon Kennedy

Luton DART marks a significant investment in the town’s civil infrastructure by Luton Borough Council’s airport company Luton Rising. Arup has played a key role working alongside Luton Rising on this landmark infrastructure project, assembling a large team of architects, engineers, and specialists to help meet the client’s aspiration for a world-class airport experience. Arup’s role covered all aspects of the planning, costing, procurement, and design, including station architecture, operating systems, and operational readiness.

Luton Direct Air-Rail Transit (DART) / Arup - Interior Photography
© Simon Kennedy

The scheme comprises two stations, a viaduct, a bridge, and a ‘cut-and-cover’ tunnel beneath a live taxiway. Arup has created a sense of place for passengers, with intuitive and easy-to-navigate spaces. DART Parkway and Central Terminal stations are characterized by their signature parasols. A simple and functional style delivers a consistent and high-quality architectural experience for travelers’ journeys from start to finish.

Luton Direct Air-Rail Transit (DART) / Arup - Interior Photography
© Simon Kennedy
Luton Direct Air-Rail Transit (DART) / Arup - Image 33 of 39

The project prioritizes accessibility with numerous features to facilitate ease of use for all passengers, including tactile paving and audio frequency induction loops. The two stations have created a new identity for Luton Airport with their signature parasols that are repeated across the wider development. Each parasol is held by a single centrally loaded column and cantilevers across approximately 20m in width. These bright sculptural forms are cleverly detailed to appear elegant in their design, bringing joy and delight to passengers.

Luton Direct Air-Rail Transit (DART) / Arup - Interior Photography, Kitchen, Facade
© Simon Kennedy

Both DART Parkway and Central Stations are naturally ventilated throughout the concourse and platform areas, lowering the operational carbon footprint of the stations against a mechanical approach. The transport system is powered by an efficient electric drive system which incorporates energy recovery during braking. The energy can be consumed in the vehicle (HVAC) and elsewhere in the station facilities, reducing the total energy consumption of the whole system.

Luton Direct Air-Rail Transit (DART) / Arup - Exterior Photography, Beam
© Simon Kennedy

The new station, with its highly reflective parasol cladding, maximizes daylighting to improve passenger and staff wellbeing. The project brought together the collaborative effort of architects, engineers, and experts across Arup to deliver a design that was innovative, elegant, and environmentally innovative.

Project gallery

See allShow less

Project location

Address:Luton, United Kingdom

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Luton Direct Air-Rail Transit (DART) / Arup" 20 Jan 2024. ArchDaily. Accessed . <https://www.archdaily.com/1011317/luton-direct-air-rail-transit-dart-arup> ISSN 0719-8884

© Simon Kennedy

卢顿空铁直达转运站(DART) / Arup

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.